PROJECT: The Marquis
LOCATION: 27 S. 3rd St. (former Pine Street Garage)
CURRENT STAGE: PRE-STAGE 1
CURRENT STAGE TIMELINE: 7/24/23 - 10/31/23
ROAD IMPACTS:
- Pine Street will remain OPEN, with two (2) travel lanes one-way westbound, accessible via S. 3rd St.
- Ferry Street will remain OPEN, with the perimeter fence extending to the edge of the current westbound lane - this lane will not be available. However, a single eastbound lane will remain open the entire stretch of Ferry St. as a one-way eastbound, accessible via S. 4th St.
- S. 3rd Street will remain OPEN.
- S. 4th Street will remain OPEN.
*S. 3rd Street sidewalk (west side) alongside Marquis project is CLOSED to pedestrians.

Please Note:
Road Closures
When Ferry Street is closed at S. 4th Street, to get around the closure make a left/right on Spruce Street Followed by a left on S. Bank Street to reach the partially open eastbound land of Ferry Street and make a right to reach S 3rd St.